‌Inspection Standard

The full-process inspection standard for diamond composite products is divided into four stages: incoming materials/feeding, roughcast, semi-finished products, and finished products


1. Incoming / Feed Inspection Standards (Raw Material Checkpoint)


2. Blank inspection standard (initial inspection after molding)


3. Semi-finished product inspection standards (during processing)


4. Finished product inspection standard (final inspection before delivery)



A closed-loop control system has been established, encompassing raw materials, blanks, semi-finished products, and finished goods:


  • Raw material side: Control purity, particle size, and plating to avoid inherent defects;
  • Blank end: Lock in core properties such as thermal conductivity and thermal expansion coefficient, and eliminate internal defects;
  • Semi-finished product end: control processing accuracy and mechanical properties;
  • Finished product end: Ensure the appearance, surface treatment, and final dimensional accuracy to guarantee the delivery quality.